top of page

CLICK AND DOWNLOAD OUR REPORTS FOR YOUR GUIDELINES

1      COSL SEEKER                                - Deck Crane Annual Inspection Report. 

2      COSL SEEKER                                - LGI Annual Inspection Report.  

3      COSL SEEKER                                - Watertight Accommodation Door Replacement Report 

4      COSL SEEKER                                - Fall Arrestor Inspection report 

5      COSL SEEKER                                - Report For Replacement And Certification Of Non-conform

                                                                  padeyes on offshhore baskets And Containers. 

 

6      COSL SEEKER                                - Fluke Manometer Calibration. 

7      HORIZON 7 LTD                              - Pressure Gauge Calibration. 

 

 

8      BORR DRILLING RIG (NORVE)      - Derrick Close Visual Survey Report.  

9      BORR DRILLING RIG (NORVE)      - Rig Crown Inspection Report. 

10    BORR DRILLING RIG (NORVE)      - Inspection (Tapping & Torqueing) Of Derrick Bolts Report. 

11    BORR DRILLING RIG (NORVE,      - Seabed Debris Survey Report. 

        BALDER, GROA & FRIGG)

12    BORR DRILLING RIG (NORVE)      - Trolley Beam Inspection (VT, MPI & UT) and Load Test 45T Report.

13    BORR DRILLING RIG (NORVE)      - Ac Top Drive Systems Consolidated Report.

 

 

14    VANTAGE (TOPAZ DRILLER)          - Full Package for Design and Calculation Note for BOP 13 5-8''

                                                                  Lifting-Access Platform.

15    VANTAGE (TOPAZ DRILLER)          - Full As Built Package - Stripping Tank 1.34m3 - 8.43bbl 

16    NOIAA                                             - Load Testing and Visual Inspection Report. 

17    SIM INTERNATIONAL                     - Slings and Shackles Inspection Report. 

18    ADAMASTOS, GA                           - Hull Ultrasonic Thickness Measurements (UTM) Report. 

19    ADAMASTOS, GA                           - Anchor Chain Cables Measurements Report.

 

20    SCHLUMBERGER                           - MPI & load test of flare boom for well test.

No.       CLIENT

REPORT DESCRIPTION

REPORTS

bottom of page