VANTAGE (Topaz Driller) - NDT Inspection

IMG_2096.JPG
IMG_2088.JPG
IMG_2211.JPG
IMG-20181020-WA0002.jpg

VANTAGE (Topaz Driller) -  BOP Lifting Frame / Access platform Fabrication and Installation

20181005_094319.jpg
20181025_124957.jpg
20181020_113823.jpg
20181110_094645.jpg
20181025_125005.jpg
20181110_094523.jpg
20181025_125041.jpg
20181111_125038.jpg

VANTAGE (Topaz Driller) - Stripping Tank Fabrication and Installtion

20181020_113938.jpg
20181103_153333.jpg
20181103_153327.jpg
SUPERIMPOSE BOP ON PLATFORM Model (1)_00

Great Wall Drilling-Rig 61 - NDT/DT Inspection

20180424_095809_edited.jpg
20180417_131937_edited.jpg
20180417_141448_edited.jpg
20180418_092228.jpg

BORR DRILLING (NORVE)  -  BHA / Drill Pipe Inspection

WhatsApp Image 2020-07-13 at 10.03.40 PM
WhatsApp Image 2020-07-13 at 10.03.39 PM
WhatsApp Image 2020-07-13 at 10.03.41 PM
WhatsApp Image 2020-07-13 at 8.26.16 PM.

COSL SEEKER - Scaffolding Works Under Drill floor and on Rig Legs.

WhatsApp Image 2020-07-13 at 4.35.15 PM
WhatsApp Image 2020-07-13 at 4.35.13 PM.
WhatsApp Image 2020-07-13 at 4.35.16 PM
vlcsnap-error598_edited.jpg

COSL SEEKER - Sea Water Piping Installation

IMG_20191119_135656_821.jpg
IMG_20191119_135608_870.jpg
IMG_20191119_154624_019.jpg
IMG_20191119_135719_167.jpg

COSL SEEKER - Watertight Door Inspection.

WhatsApp Image 2020-07-13 at 9.18.11 PM.
WhatsApp Image 2020-07-13 at 9.18.12 PM.
WhatsApp Image 2020-07-13 at 9.18.11 PM
doorsafe.jpg

BORR DRILLING - Rope Access works

12.jpeg
13.jpeg
17.jpeg
16.jpeg
1.jpeg
2.jpeg
15.jpeg
14.jpeg

COSL SEEKER - SandBlasting & Painting of Mud Pit Tank

WhatsApp Image 2020-07-13 at 9.14.07 PM.
WhatsApp Image 2020-07-13 at 9.12.18 PM.
WhatsApp Image 2020-07-13 at 9.12.05 PM.
WhatsApp Image 2020-07-13 at 9.14.05 PM.

CATRAMP - Fabrication of 02 Port Hoppers

IMG_20191128_150342_692.jpg
WhatsApp Image 2020-07-15 at 9.56.05 AM.
WhatsApp Image 2020-07-15 at 9.55.56 AM.
IMG_20200124_115235_100.jpg
WhatsApp Image 2020-07-15 at 9.56.04 AM.
IMG_20200124_115006_499.jpg
IMG_20200113_083813_200.jpg
GENERAL%20ASSEMBLE%20DRAWING%20-%20STAND

BORR DRILLING - Trolley Beam Inspection (Load Test with 35T Water bag).

WhatsApp%20Image%202020-07-13%20at%208.2
WhatsApp Image 2020-07-13 at 8.26.20 PM.
WhatsApp%20Image%202020-07-13%20at%208.2
WhatsApp%2520Image%25202020-07-13%2520at

BORR DRILLING (GROA & GERD) - Seabed Debris Survey

WhatsApp%20Image%202020-05-08%20at%2011.
WhatsApp%20Image%202020-05-08%20at%2011.
WhatsApp%20Image%202020-05-09%20at%2010.
WhatsApp Image 2020-05-09 at 10.41.14 AM
WhatsApp%20Image%202020-05-09%20at%201.3
WhatsApp%20Image%202020-05-09%20at%201.3
WhatsApp Image 2020-05-09 at 10.41.13 AM
WhatsApp Image 2020-05-09 at 10.37.39 AM

COSL SEEKER - Fabrication of Galley and Conference Room Benches and Tables.

IMG_20191121_084727_291.jpg
IMG_20191121_084552_144_edited.jpg
IMG_20191121_083552_821.jpg
Foor%20Mounted%20Bench%201010%20X%20275%

COSL SEEKER - Inspection and Refurbishment of Accumulator bottles.

IMG_20191203_193628_493.jpg
IMG_20191203_193620_683.jpg
IMG_20191203_193621_614.jpg
IMG_20191121_083505_536.jpg

COSL SEEKER - Pallet drum lifter fabrication

IMG_20200512_102840_678.jpg
IMG_20200512_102905_223.jpg
IMG_20200512_102849_785.jpg
3.png

GAS DU CAMROUN - NDT Inspection and Certification.

WhatsApp Image 2020-07-15 at 9.55.44 AM.
WhatsApp Image 2020-07-15 at 9.55.45 AM.
WhatsApp Image 2020-07-15 at 9.55.47 AM.
WhatsApp Image 2020-07-15 at 9.55.52 AM

Just to name a few, Contact us for your NDT Inspection and Engineering Projects and receive your goals.

Building Long-term Relations Through Client Success